52 Days of 24/7 Federal Trial Support in Washington, D.C. — $105,000 Under Budget

Hogan Corp provided 24/7 litigation printing, equipment, transportation, catering, and trial logistics for a 70-person federal trial team in Washington, D.C.—finishing the 52-day engagement more than $105,000 under budget.

##INLINE21####INLINE0##
##INLINE22####INLINE1##
##INLINE23####INLINE2##
##INLINE24####INLINE3##
Engagement Overview

Federal Trial Support Overview

A major international publishing company faced a high-stakes federal trial in Washington, D.C. requiring immediate, full-scale operational support for a 70-person trial team over 52 consecutive days. Hogan Corp was engaged to stand up a complete trial infrastructure—from a fully equipped war room and 24/7 document production to catered meals, courtroom shuttles, and cross-country equipment logistics—all on short notice and with zero margin for operational error.

##INLINE4####INLINE25##
##INLINE5####INLINE26##
##INLINE6####INLINE27##
##INLINE7####INLINE28##
##INLINE8####INLINE29##
##INLINE9####INLINE30##
The Challenge

A High-Stakes Trial Requiring Immediate, Full-Scale Support

A major international publishing company faced a high-stakes federal trial in Washington, D.C., requiring immediate, full-scale operational support for a 70-person trial team over 52 consecutive days. The legal team needed a single trusted partner to stand up a complete trial infrastructure—from a fully equipped war room and 24/7 document production to catered meals, courtroom shuttles, and cross-country equipment logistics—all on short notice and with zero margin for operational error.

  • Rapid mobilization of equipment and personnel from Los Angeles to Washington, D.C.
  • Sustaining 24/7 operational coverage for a large, demanding trial team across 52 days
  • Managing high-volume document production with no downtime tolerance
  • Coordinating daily shuttle, catering, supply stocking, and IT support simultaneously
  • Ensuring seamless logistics so attorneys could remain focused entirely on the case
The Solution

A Fully Integrated, White-Glove Trial Operation

Hogan Corp deployed a dedicated team of 6 on-site specialists to Washington, D.C., delivering a fully integrated, white-glove trial support operation from day one. Every logistical and operational need was handled end-to-end—allowing the trial team to focus entirely on litigation strategy.

  • Stood up a fully equipped war room with 140 workstation monitors, 60 docking stations, and networked printers
  • Provided 24/7 on-site copy services with a 1,000,000-print allowance and no downtime
  • Managed all daily catering for up to 50 team members throughout the trial
  • Initially deployed four dedicated vehicles and expanded to nine vehicles and drivers as requirements increased
  • Transported all trial materials and equipment coast-to-coast
  • Stocked and restocked snacks, beverages, toiletries, and office supplies daily
  • Handled package management, document shredding and recycling, witness greeting, and staff errands
Document Production

On-Site Document Production & Copy Services

High-Volume Copy Services

  • 24/7 high-volume copy center operations
  • 1,000,000 prints included in allowance
  • No separate copier rental charge when utilizing Hogan Corp’s 24/7 on-site document production service

24/7 Staffed Production

  • Staffed continuously by trained Hogan Corp professionals
  • Full 52-day coverage with zero downtime
  • Dedicated copy specialists on-site around the clock

Document Services Provided

  • High-volume printing, copying, and scanning
  • Exhibit production and binder assembly
  • Custom tabs, folders, paper, and toner included
Equipment & Technology

War Room Setup and Equipment Rental

Hogan Corp provided, configured, and managed all workstation technology and trial equipment—including full setup, teardown, cabling, and cross-country freight of all Hogan Corp-owned equipment from Los Angeles to Washington, D.C. and back.

Workstation Monitors

  • 140 × ASUS VN279QL 27-inch FHD monitors (2 per person)
  • Full setup, cabling, and teardown
  • Ethernet, HDMI, and power strip management

Network Printers & Docks

  • 10 × LaserJet Enterprise M553dn network printers
  • 70 × optical mice and 60 × Dell 6000 Docking Stations
  • Fully networked for the entire 70-person trial team

Cross-Country Freight

  • Round-trip freight of all trial materials and equipment
  • Los Angeles → Washington, D.C. → Los Angeles
  • Covers all Hogan Corp-owned equipment and supplies
Daily Logistics

Shuttle, Catering and Daily Logistics

Shuttle & Transportation

  • Initially 4 dedicated vehicles, expanded to 9 vehicles and drivers as trial demands grew
  • Routes: airport, hotel-to-office, office-to-courthouse
  • Parking for full trial duration included

Catering Services

  • 45-day catering program (July 18–August 31)
  • Full meal coordination for the trial team
  • Management fee applied over actual cost

Supplies & Provisions

  • Snacks, beverages, toiletries, and OTC medications daily
  • Invoiced monthly at cost
  • Office supplies: binders, folders, tabs, binding, custom labels
Results

Results: 10.21% Under Budget

Hogan Corp delivered the full 52-day engagement 10.21% under the original budget estimate—saving the client $105,375.08 through disciplined cost management, proactive planning, and operational efficiency. The entire operation ran seamlessly from the initial Los Angeles mobilization through the final day of trial, with the Hogan Corp team providing uninterrupted 24/7 support across every service line.

##INLINE31####INLINE10##
Estimated: $1,031,852.00Actual: $926,476.92
CategoryBudgetActualVarianceResult
Labor$561,600$496,800−$64,80012% Under
Equipment$75,600$75,600$0No Change
Shuttle$26,000$53,000+$27,000Over (9 vs. 4 vehicles)
Supplies$18,000$15,132−$2,86816% Under
Snacks & Beverages$24,000$25,295+$1,295Slight Over
Hotel$61,152$61,152$0No Change
Transportation$18,000$18,000$0No Change
Catering$247,500$181,497−$66,00327% Under
Total$1,031,852$926,477−$105,37510.21% Under

Key Savings Highlights

Labor ($64,800 saved): Efficient team deployment, including additional Hogan Corp members, came in well under the labor estimate.

Catering ($66,003 saved): Effective meal portion planning throughout the 45-day catering period significantly reduced costs.

Supplies ($2,868 saved): Strategic recycling and reuse of trial supplies throughout the engagement reduced waste.

Where Overages Occurred

Shuttle (+$27,000): Trial demands required 9 vehicles and drivers versus the 4 originally estimated—a scope expansion driven by client operational needs.

Snacks & Beverages (+$1,295): Minor overage attributable to an expanded trial team and increased snack requests.

FAQ

Frequently Asked Questions About Federal Trial Support

What services did Hogan Corp provide for the Washington, D.C. federal trial?
Hogan Corp provided 24/7 on-site trial support including high-volume copy services with a 1,000,000-print allowance, equipment rental (140 monitors, 10 network printers, 60 docking stations), daily catering for up to 50 team members, a 4-vehicle shuttle fleet, staff accommodations, cross-country freight from Los Angeles, and daily supply stocking for the full 52-day engagement.
How long did the Washington, D.C. trial support engagement last?
The engagement lasted 52 consecutive days, from July 11 through August 31, 2022, with continuous on-site operational coverage.
How much did Hogan Corp save the client on this trial?
Hogan Corp completed the engagement $105,375.08 under the original estimate, a total savings of 10.21%.
Can Hogan Corp mobilize trial support on short notice?
Yes. Hogan can rapidly coordinate equipment, personnel, production, transportation, food service, and daily logistics once the city, venue, schedule, team size, and service requirements are confirmed.
Does Hogan Corp provide trial support outside of Washington, D.C.?
Yes. Hogan provides nationwide trial operations with owned equipment, company-operated transportation, and dedicated on-site personnel.